AN ACT PROVIDING FOR THE PUBLIC-PRIVATE PARTNERSHIP (PPP) CODE OF THE PHILIPPINES

Public-Private Partnership (PPP) Code of the Philippines

Year:

2023

Category:

Other

Date Approved:

December 5, 2023

Summary

Plain-language AI-assisted summary — not the official text. As of July 1, 2026. Read the full text below or on the official source.

This Act establishes the Public-Private Partnership (PPP) Code of the Philippines, which aims to create an enabling environment for private sector participation in infrastructure and development projects. It sets forth policies to ensure equitable risk allocation, promote sustainability, and enhance public welfare through effective partnerships between the government and private entities.

Full Text

Nineteenth Congress
Second Regular Session

[ REPUBLIC ACT NO. 11966, December 05, 2023 ]

AN ACT PROVIDING FOR THE PUBLIC-PRIVATE PARTNERSHIP (PPP) CODE OF THE PHILIPPINES

Be it enacted by the Senate and House of Representatives of the Philippines in Congress assembled:

Section 1. Short Title. - This Act shall be known as the “Public-Private Partnership (PPP) Code of the Philippines”.

Section 2. Declaration of Policy. - The State recognizes the indispensable role of the private sector, encourages private enterprise, and provides incentives to needed investments. To this end, the State shall provide an enabling environment for the private sector to mobilize its resources to finance, design, construct, operate, and maintain infrastructure or development projects and services.

It is further declared that the State shall protect the public interest by providing affordable, accessible, and efficient public services. In order to achieve better quality of Public-Private Partnership (PPP) Projects at lower costs, the State shall ensure equitable risk allocation in PPP Projects, and that all PPP Projects yield sufficient Value for Money (VFM), promote sustainability, and advance public welfare.

The State shall pursue a policy of financing infrastructure and other development projects and services through all means available to effectively meet the objectives of the government. These may include appropriations, official development assistance (ODA), and PPPs, as well as combinations and variations thereof. The government shall determine the appropriate financing by considering budget availability, VFM, timelines, stakeholder commitments, and market capacity.

The State recognized the autonomy of local government units (LGUs) in entering and implementing Local PPP Projects to enable them to attain their fullest development as self-reliant communities and make them more effective partners in the attainment of national goals.

The State shall also ensure the integration of climate resilience, sustainability, and gender and development policies and programs in the planning, design, and implementation of PPP Projects.

The State shall take cognizance of partnerships that have not been submitted through the administrative process as long as they are PPPs as defined in this Code, and shall therefore subject such projects under its jurisdiction and rules.

Finally, it is declared that the State and LGUs shall affirm open, fair, transparent, and competitive selection as the central tenet for securing private investment in PPP Projects. It shall implement a policy of full public disclosure of all its transactions involving public interest, subject to terms and conditions as prescribed by pertinent laws.

Section 3. Definition of Terms. - As used in this Code:

Section 4. Coverage. - This Code shall cover all contractual arrangements between an Implementing Agency and a Private Partner to finance, design, construct, operate, and maintain, or any combination or variation thereof, infrastructure or development projects and services which are typically provided by the public sector, where each party shares in the associated risks. PPP Projects may be financed partly from direct government appropriations and/or from ODA of foreign governments or institutions.

ODA, when used as a source of financing for PPP Projects, shall include blended finance where the partner government, bilateral or multilateral agency, or international or multilateral lending institution may mobilize financing from private or commercial institutions in funding the loan or loan grant.

For purposes of this Code, ODA agreements shall be considered executive agreements.

The Code shall also cover the following::

This Code shall not apply to infrastructure projects undertaken under Republic Act No. 9184 or the "Government Procurement Reform Act", management contracts, service contracts, divestments or dispositions, corporatization, incorporation of subsidiaries with private sector equity, onerous donations, gratuitous donations, and joint venture agreements involving purely commercial arrangements that neither provide nor include public infrastructure or development services. In such cases, the aforementioned contractual arrangements shall be implemented in accordance with relevant governing laws.

Section 5. Authority to Undertake PPP Project. - All Implementing Agencies as defined in Section 3(q) of this Code are hereby authorized to identify, develop, assess, evaluate, approve, negotiate, award, and undertake PPP Projects in accordance with the provisions f this Code.

Section 6. Identification and Development of PPP Projects. - Implementing Agencies shall identify, develop, and prepare their respective lists of PPP Projects guided by the following principles: effectiveness in meeting government objectives, appropriateness of the chosen procurement modality and source of funding, VFM, accountability and transparency, consumer rights, affordability, and public access, safety, and security. All PPP Projects shall be consistent and responsive to national, local, and sectoral development and investment plan.

The Implementing Agencies shall submit their lists of PPP Projects or any update thereto to the appropriate oversight agencies, including the National Economic and Development Authority (NEDA), the regional development councils (RDCs) concerned, the local Sanggunian concerned, and the PPP Center, in accordance with rules, regulations, and guidelines promulgated pursuant to the provisions of this Code.

Implementing Agencies shall include in their development plans, strategies, and investment programs such lists of PPP Projects that they intend to implement by soliciting proposals from Private Proponents pursuant to Section 9 of this Code. Unsolicited Proposals under Section 10 of this Code.

In developing a PPP Project, the Implementing Agency shall consider the following: (a) legal, technical, economic, financial, and commercial, feasibility of the project; (b) VFM of the proposed project; (c) optimal risk allocation; (d) affordability of fees or tariffs; (e) climate resilience and sustainability; and (f) social and environmental safeguards. The development of a PPP Project shall only be undertaken after the conduct of stakeholder consultation.

Section 7. Approval of PPP Projects. -

Section 8. PPP Pre-qualification, Bids and Awards Committee. - The Head of the Implementing Agency undertaking PPP Projects shall create a PPP Pre-qualification, Bids and Awards Committee (PBAC), which shall be responsible for all aspects of pre-bidding and bidding process in Solicited Proposals, or the comparative bidding process in Unsolicited Proposals: Provided, That the final draft PPP contract shall be reviewed and approved by the Head of the Implementing Agency, upon securing the clearance of the following:

Section 9. Solicited Proposals. -

Section 10. Unsolicited Proposals. -

Section 11. Joint Ventures (JV). - A JV may be undertaken through a contractual JV or by creating a JV company: Provided, That:

Section 12. Protest Mechanism. - In all stages of the procurement process for the National and Local PPP Projects, the mechanism for protest shall be resolved in the most expeditions manner which shall not exceed forty-five (45) calendar days.

Unless otherwise provided in this Code, in no case shall a motion for reconsideration or an appeal from any decision by the PBAC, Head of Implementing Agency, or Department Secretary stay of delay the bidding process. No award shall however be made until a decision on any pending appeal is rendered.

Section 13. Issuance of Franchise and Regulation of Tolls, Fares, Fees, Rentals, and Other Charges. - All regulatory bodies charged with approval of initial tolls, fares, fees, rentals, and other charges and adjustments thereof, including, but not limited to, the Toll Regulatory Board, the Civil Aviation Authority of the Philippines, and the Land Transportation Franchising and Regulatory Board, shall:

Where the Implementing Agency fails to implement the initial tolls, fares, fees, rentals, and other charges and adjustments thereof as stipulated in the PPP contract, the Private Partner shall be allowed to recover the difference through measures consistent with the PPP contract and applicable laws, rules, and regulations.

The approved initial tolls, fares, fees, rentals and other charges - or the maximum acceptable initial values of the toll, fare, fee, rental, or charge that may be proposed by bidders in the case of projects for public bidding where the bid parameter is the initial value of the toll, fare, fee, rental, or charge itself - and adjustments thereof shall be included in the final draft PPP contract that will be circulated to all bidders prior to the bud submission date to be set by the Implementing Agency.

In the absence of an appropriate regulatory body, the initial tolls, fares, fees, rentals and other charges and adjustments thereof shall be stipulated in the PPP contract. In the case of Local PPP Projects, the Implementing Agency may also opt to create and establish a local rate setting body: Provided, That the composition, powers, and responsibilities of such body shall be set forth in an ordinance or resolution approved by the local Sanggunian of the Implementing Agency.

The Implementing Agency and the PPP Center shall post in their respective websites the approved initial tolls, fares, fees, rentals, and other charges and adjustments thereof in a PPP Project.

Section 14. Mandatory Inclusion of Dispute Avoidance and Alternative Dispute Resolution Mechanisms in PPP Contracts. - All PPP contracts shall include provisions on the use of dispute avoidance and Alternative Dispute Resolution (ADR) mechanisms pursuant to Republic Act No. 9283, otherwise known as the "Alternative Dispute Resolution Act of 2004". The contracting parties shall be given complete freedom to choose which ADR mechanisms to be followed, subject to applicable laws, rules, and regulations.

Section 15. Adoption of Contract Management and Risk Mitigation Plans in PPP Projects. - In order to manage the financial risks arising from PPP Projects, strengthen the credibility of the PPP Program and PPP Projects among the private sector, and to ensure the timely compliance with the contractual obligations of Implementing Agencies, PPP Projects undertaken through this Code shall require the adoption of contract management and risk mitigation plans, Such plans shall include the agreed project execution plan, all risks assumed by the government under the PPP contract, risks assumed by the Implementing Agency, risk mitigating measures, estimated costs to be incurred, target timeline to have each measure in place, and the appropriate action plan by the Implementing Agency to manage each type of risk. All plans shall be kept up-to-date and be submitted to the PPP Center for monitoring.

Section 16. Project Supervision and Monitoring. - Every PPP Project shall be implemented in accordance with the signed PPP contract. The Implementing Agency shall be entitled to exercise sufficient powers of supervision, monitoring, and control over the implementation of each PPP contract it has entered into/

The PPP Center shall be responsible for the coordination and monitoring of PPP Projects. For this purpose, the Implementing Agency shall submit to the PPP Center all executed PPP contracts, information on the status of projects implemented by, as well as copies of all Unsolicited Proposals and related documents received by, the Implementing Agency, arbitral awards or settlement agreements, and loan or financing documents of the Private Partner for the PPP Project. At the end of every calendar year, the PPP Center shall submit a particularly to the Senate President and the Speaker of the House of Representatives and the Joint Congressional Oversight Committee pursuant to Section 33 of this Code, on the progress of all PPP Projects.

Section 17. Investment Incentives. - PPP Projects undertaken through this Code shall entitled to various incentives under applicable laws and existing policies of the government: Provided, That any exemptions or special rates on taxes for a PPP Project granted during the term of its PPP contract shall be reported in writing to the PPP Center.

Section 18. Investment Recovery Scheme. - In undertaking PPP Projects, the Private Partner shall be allowed to recover its investments and earn reasonable profit through any of the following schemes or a combination thereof:

Other investment recovery schemes, such as commercial development rights, or the grant of a portion or percentage of a reclaimed land, subject to the constitutional requirements on land ownership, may also be allowed to supplement the foregoing schemes: Provided, That such investment recovery schemes involving the grant of a portion or percentage of a reclaimed land shall be subject to fair valuation.

Section 19. Variation, Expansion, or Extension of an Existing PPP Project. - A contract variation, expansion, or extension of an existing PPP Project may be allowed subject to due diligence and recommendation of the Head of the Implementing Agency.

The following variation, expansion or extension of an existing PPP Project shall be approved by the appropriate Approving Body:

The Approving Body may establish limitations on allowable variations relating to items (c), (d), and (e), as part of the approved PTCs of the PPP Project during the approval process of the project. During project implementation, any proposed changes to the approved limitations to the aforementioned allowable variations shall be submitted to the appropriate Approving Body for decision. The Approving Body may treat the proposed changes as a new project. If the Approving Body treats the proposed changes as a new project, t he same shall be subject to the approval process under Section 7 of this Code.

All other variations not covered in items (a) to (e) above shall be approved in writing by the Head of the Implementing Agency, and reported to the PPP Center, also in writing.

Failure to secure the approval of the Head of the Implementing Agency and/or the appropriate Approving Body, as provided in this section, shall render the variation void. No variation shall be implemented before the variation is approved. The splitting of any proposed changes, for the purpose of circumventing the limitations and conditions prescribed in the PTCs set by the Approving Body, is expressly prohibited.

The provisions of this section shall apply prospectively to all exiting franchise and concessions granted for the financing, construction, operation, and maintenance of infrastructure facilities under previous laws and decrees: Provided, That such shall not impair the substantive rights of the Private Partner, and shall be governed by exiting laws, decrees, orders rules, and regulations at the time of application.

Section 20. Divestment. - A Private Partner may divest its ownership, rights, or interests in a PPP Project, subject to the approval of the Head of the Implementing Agency: Provided, That the divestment shall be after a holding or lock-in period as indicated in the PPP contract: Provided, further, That the new Private Partner, has equal or better qualifications as with the previous Private Partner.

The Implementing Agency may also divest its ownership, rights, or interests in a PPP Projects: Provided, That PPP Projects which involve full or partial divestment or transfer of ownership of government assets or properties shall be subject to approval of the appropriate Approving Body and applicable laws, decrees, orders, rules, and regulations.

Section 21. Contract Termination. - All PPP contracts shall define all events that may lead to its termination, including but not limited to, either party event of default, force majeure and other no-fault termination events, and other termination events, a may be agreed upon by the parties to the PPP contract.

For such events that may lead to contract termination, the PPP contract shall provide remedies, curing periods, lender step-in rights, remittance procedures, default interest rates, and written notice requirements agreed upon by both parties. The contract shall likewise provide that termination shall take place only upon failure to remedy or cure the default in accordance with the PPP contract.

The PPP Project shall not be terminated for an event of default without exhausting the corresponding remedy or curing period.

The PPP Governing Board shall issue guidelines on the determination of Termination Payments and related reportorial requirements.

Section 22. Wind-up and Transfer Measures. - All PPP contracts shall provide for wind-up and transfer measures. Such provision shall include, among other, the following:

Section 23. Prohibition on the Issuance of Temporary Restraining Orders, Preliminary Injunctions, Preliminary Mandatory Injunctions, and Similar Provisional Remedies. - No temporary restraining order, preliminary injunction, preliminary mandatory injunction, temporary environmental protection order, or similar temporary or provisional reliefs or remedies shall be issued by any court, except the Supreme Court, against any Implementing Agency or the PPP Center, its officials or employees, or any person or entity, whether public or private acting under the government direction, to restrain, prohibit, or compel the following acts:

This prohibition shall apply in all cases, disputes, or controversies instituted by any person, including cases filed by bidders or those claiming to have rights through such bidders. This prohibition shall not apply when the matter is of extreme urgency involving a constitutional issue, such that unless a temporary restraining order is issued, grave injustice and irreparable injury will arise. The applicant shall file a bond in an amount to be fixed by the court. The bond shall accrue in favor of the government if the court should finally decide that the applicant was not entitled to the relief sought.

In addition to any civil and criminal liabilities a judge may incur under existing law, any judge who shall issue a temporary restraining order, preliminary injunction or preliminary mandatory injunction, temporary environmental protection order, or similar temporary or provisional reliefs or remedies in violation of this section shall suffer the penalty of suspension of at least sixty (60) calendar days without pay.

Any temporary restraining order, preliminary injunction, preliminary mandatory injunction, temporary environmental protection order, or similar temporary or provisional reliefs or remedies issued in violation of this section is void and of no force and effect.

If after due hearing the court finds that the award of the contract is null and void, the court may, if appropriate under the circumstances, award to contract to the qualified and winning bidder or order a rebidding of the same, without prejudice to any liability that the guilty party may incur under existing laws.

Section 24. PPP Center. - To achieve the goals of this Code, the PPP Center created under Executive Order No. 8, series of 2010, as amended by Executive Order No. 136, series of 2013, and further amended by Executive Order No. 30, series of 2023, is hereby authorized to adopt its current organizational structure, absorb its existing employees, and upgrade its human resource component, as may be necessary, subject to applicable laws, rules, and regulations.

Section 25. PPP Governing Board. - The PPP Governing Board, created under Executive Order No. 136, series of 2013, as amended by Executive Order No. 30, series of 2023, is hereby institutionalized. It shall be the overall policy-making body for all PPP-related matters, including the PDMF. It shall be responsible for setting the strategic direction of the PPP Program and PPP Projects and in creating an enabling policy and institutional environment for PPP.

The PPP Governing Board shall be composed of the following:

The members of the PPP Governing Board may designate their respective alternates, who shall in no case be lower than an Assistant Secretary, and whose acts shall be considered the acts of their principals.

The presence of the Chairperson and five (5) other members of the PPP Governing Board shall constitute a quorum and a majority vote of the members present shall be necessary for the adoption of any issuance, order, resolution, decision or other act of the PPP Governing Board in the exercise of its functions. The PPP Governing Board shall act as a collegial body.

All issuances, orders, resolutions, decisions, or other acts of the PPP Governing Board shall be binding, unless otherwise stated by the PPP Governing Board.

Section 26. Project Development and Monitoring Facility (PDMF). - The PDMF referred to under Executive Order No. 8, series of 2010, as amended by Executive Order No. 136, series of 2013, and further amended by Executive Order No. 30, series of 2023, is hereby institutionalized. The PDMF shall be used for the procurement of advisory and support services related to the preparation, structuring, evaluation, procurement, probity management, Financial Close, and monitoring of implementation of PPP Projects. The PDMF may also be used for such other services as may be required or contemplated under applicable laws, rules, and regulations, and as may be determined by guidelines and procedures to be issued by the PPP Governing Board.

The PDMF may be funded through the GAA, ODA, or other sources, subject to applicable laws, rules, and regulations. Subject to the provisions of the GAA and relevant accounting and auditing rules and regulations, Implementing Agencies are hereby authorized to reallocate their funds for purposes of the PDMF.

The PDMF shall continue to be managed and administered by the PPP Center as a revolving fund. In order to sustain the PDMF, the PPP Center may recover amounts disbursed and receive fees in accordance with the guidelines to be approved by the PPP Governing Board. Such amount shall be retained and authorized to be used by the PPP Center for the purposes indicated herein.

The PDMF Committee is hereby institutionalized to approve applications for PDMF support submitted by the Implementing Agencies.

The PDMF Committee shall be composed of one (1) representative, who shall in no case be lower than Assistant Secretary, from the following agencies: NEDA as Chairperson, DOF as Vice Chairperson, DBM, and PPP Center.

Subject to approval of the PPP Governing Board, the PDMF Committee shall also formulate, prescribe, and recommend policies, procedures, and guidelines for the use of PDMF and recovery of costs charged to the fund.

Section 27. Creation of a Risk Management Fund. - To ensure fiscal sustainability and negotiate better financing terms of PPP Projects, there is hereby created a PPP Risk Management Fund to be used for the payment of Contingent Liabilities arising from PPPs in accordance with its contract terms. The PPP Risk Management Fund shall be funded by: (a) general appropriations; (b) income from existing PPP Projects; and (c) other sources as may be determined by the Development Budget Coordination Committee (DBCC): Provided, That the PPP Risk Management Fund shall be managed by the PPP Center.

The Inter-Agency Technical Working Group on Contingent Liabilities created under the DBCC Resolution No. 2015-2 is hereby institutionalized.

The PPP Center, in coordination with the aforementioned Inter-Agency Technical Working Group, shall formulate the guidelines on the management of Contingent Liabilities arising from PPP Projects and the use of the PPP Risk Management Fund, for approval by the DBCC.

The target amount in the PPP Risk Management Fund is to be determined by the DBCC using risk-adjusted methods or such other means that estimate the exposure of the Government of the Philippines to PPP Contingent Liabilities.

In the case of Local PPP Projects, a similar PPP Risk Management Fund may be established by the LGU subject to the guidelines to be issued by the PPP Governing Board. Sources of the fund may include the budget of the LGU and the income of the LGU from PPP Projects. The LGUs may also access the PPP Risk Management Fund of the National Government, subject to the payment by LGUs of contributions in accordance with the guidelines to be issued by the DBCC.

Section 28. Establishment of a PPP Unit. - The Head of the Implementing Agency may establish a PPP Unit, or assign responsibility to an appropriate unit to act as it PPP unit, which shall plan, oversee, and monitor PPP Projects of the Implementing Agency.

Such unit shall be headed by a senior official and include as members, among others, technical, finance, and legal personnel who are knowledgeable on PPPs.

Such unit shall provide reports to the Head of the Implementing Agency and the PPP Center and shall comply with other reporting and monitoring processes and procedures as may be required by the PPP Center, consistent with this Code. Furthermore, the PPP Center shall provide such unit technical assistance and capacity development necessary for the performance of its roles and functions.

Section 29. Safekeeping and Public Disclosure of tender Documents and PPP Contracts. - Copies of all tender documents and PPP contracts executed under this Code shall be considered, appropriately kept safe, and preserved, as public documents. The Implementing Agency and the PPP Center shall publish, through their respective websites, copies of all (a) tender document, and (b) PPP contracts executed under this Code. In case of PPP contracts with provisions which are proprietary, or may pose threats to national security or public safety, the procedures for the disclosure and publication of such contracts shall be consistent with existing and applicable laws, rules, and regulations.

Section 30. Miscellaneous Provisions. -

Section 31. Accountability in PPP Projects. - The Head of the Implementing Agency concerned shall at all times be accountable to PPP Projects undertaken through this Code. The Private Partner shall likewise be held accountable for the works it has delivered and services it has rendered for a PPP Project. All PPP contracts are hereby required to clearly define the scope of each party's accountability under the PPP contract. Without prejudice to the penalties stated in Section 32 of this Code, failure of the Head of the Implementing Agency to comply with their obligations under the PPP contract shall allow the Private Partner to avail the appropriate remedy as provided in the PPP contract.

PPP Projects awarded under this Code shall be subject to the Government Auditing Code of the Philippines and the 2009 Revised Rules of Procedures of the Commission on Audit (COA) and any amendments thereto. The COA, in consultation and coordination with the PPP Center, shall adopt and promulgate the necessary framework and guidelines on accounting and auditing PPP Projects, respectively.

Section 32. Administrative, Civil, and Penal Sanctions. - Without prejudice to the provisions of Republic Act No. 3019, otherwise known as the "Anti-Graft and Corrupt Practices Act:", and other penal laws, any person, whether private individual or public officer or employee, who commits any of the prohibited acts under (a), (c), (d), (e), (f), (k), (l), (m), (n), and (o) of this section, shall be punished by imprisonment from a minimum of three (3) years to a maximum of six (6) years and a fine ranging from One million pesos (P1,000,000.00) to Five million pesos (P5,000,000.00). For prohibited acts under (b), (h), (i), and (j) of this section, the penalty of imprisonment of three (3) to six (6) years or a fine ranging from One million pesos (P1,000,000.00) to Five million pesos (P5,000,000.00), or both, shall be imposed.

In addition, such acts committed by the Private Partner and its concerned officers may cause the termination of the PPP contract, the lapse of any applicable warranty period, and the perpetual disqualification of the Private Partner from participating in any public bidding or entering into any contractual arrangement allowed in this Code. This is without prejudice to any other civil or administrative liability that erring officials, Private Proponents, or Private Partners may incur.

The liability of the public officer or employee or former public officer or employee for any violation of the prohibitions under this Code shall survive the retirement, resignation, expiration of term, or removal from office of said public officer or employee, and shall include the prohibition for the erring officer to hold public office, either as an elected, or an appointed government official to any local or national position, regard to any activity provided or authorized in this Code, the termination of the PPP contract, and the lapse of any applicable warranty period/s.

No administrative, criminal, or civil proceedings shall lie against any person for having committed acts under items (a) to (o) in the regular performance of his duties in good faith.

Section 33. Joint Congressional Oversight Committee. - A Joint Congressional Oversight Committee is hereby created to oversee the implementation of this Code. The Committee shall be composed of five (5) members each from the Senate and House of Representatives to be designated by the Senate President and the Speaker of the House of Representatives, respectively. The Committee shall be jointly chaired by the respective Chairpersons of the House Committee on Public Works and Highways, the House Committee on Appropriations, the Senate Committee on Public Works, and the Senate Committee on Finance.

Section 34. Implementing Rules and Regulations (IRR). - The IRR Committee shall be composed of the members of the PPP Governing Board. The Secretary of NEDA shall serve as the Chairperson, and the PPP Center as the Secretariat.

The members of the PPP Governing Board may designate their respective alternates whose acts shall be considered the acts of their principals.

The IRR Committee shall promulgate the IRR within ninety (90) calendar days from the effectivity of this Code, after a public consultation with relevant stakeholders including the Department of Public Works and Highways, the Department of Transportation, other key Implementing Agencies, LGUs, and the Joint Congressional Oversight Committee created under Section 33 of this Code. The IRR shall include, among others, the procedures for approval of PPP Projects, processing of Unsolicited Proposals, evaluation of bid proposals, and protests; framework for supervision and monitoring of PPP Projects, and mechanism for setting the Reasonable Rate of Return; and list of Government Undertakings that may be granted to a PPP Project, in order to carry out the provisions of this Code in the most expeditious manner.

The IRR Committee may promulgate, after due public consultation, amendments to the IRR, consistent with the provisions of this Code. Amendments to the IRR shall take effect fifteen (15) calendar days after its complete publication in the Official Gazette or in a newspaper of general circulation.

Section 35. Transitory Clause. - All existing contracts and upcoming PPP Projects affected by this Code shall be treated as follows:

All unexpended funds of the PPP Center at the end of the fiscal year, as well as unreleased appropriations, and undisbursed funds after the end of the validity period, shall revert to the National Treasury and shall not thereafter be available for expenditure, except by subsequent legislative enactment. The amount necessary to carry out the organizational changes of the PPP Center provided in this Code shall be determined by the PPP Governing Board. Appropriations for succeeding years shall be incorporated in its budget proposals, subject to the existing budgeting rules and regulations.

All officials and employees of the PPP Center shall be retained and shall not suffer any loss of seniority or rank or decrease in emoluments.

Upon effectivity of this Code, no other JV guidelines, PPP guidelines, codes, or ordinances, whatsoever may be enacted, issued and/or used by any government entity to enter into PPPs, except those that are enacted, issued, and/or used in accordance with this Code and its IRR.

Section 36. Separability Clause. - If any provision of this Code is declared unconstitutional or invalid, other parts or provisions hereof not affected thereby shall continue to be in full force and effect.

Section 37. Repealing Clause. -

All other references to Republic Act No. 6957 and Republic Act No. 7718 in existing laws, decrees, and other legislation are hereby amended to refer to this Code.

All executive orders and administrative laws, decrees, orders, codes, issuances, rules and regulations, and ordinances or any part thereof inconsistent with or contrary to this Code are hereby repealed or modified accordingly.

Section 38. Effectivity. - This Code shall take effect fifteen (15) calendar days after its publication in the Official Gazette or in a newspaper of general circulation.

Approved,

This Act, which is a consolidation of Senate Bill No. 2233 and House Bill No. 6527, was passed by the Senate of the Philippines, and the House of Representatives on September 27, 2023.

Approved: DEC 052023

(SGD.) FERDINAND ROMUALDEZ MARCOS JR.
President of the Philippines


Share
Email
Source

Official source from LawPhil:

View on LawPhil Last updated: Jul 1, 2026